I'm back in Skierniewice, this is the entrance to the factory. Full with plants, to show how 'green' we are over here.....Tonight Pawel will take us (chinese guy and me) to a real good Polish restaurant, this will be fun!
The Emperor said: Strike your refractor down with all of your hate and your transformation to the deep-sky side will be complete
There was a very bright almost full moon last night. But I decided to go "deepsky" anyway because I wanted to test my UHC-s filter.
For our trip to Wales I found a very nice map of the UK, it is:

After pimping my scope over the last months with the many cloudy nights I really had to know if my system was working as it should.
After viewing my Saturn picture many times I thought there were still many details in the picture that could be improved with the proper postprocessing.
For the first time I could use my IR/UV block and IR pass filters. I made 2400sec exposures with the IR/UV block filter (RGB frames) and the IR pass filter (luminance frames). From each avi I stacked 800 of the best frames, totalling into a 80sec RGB and 80sec IR picture. I combined both pictures with photoshop into the following picture. The result is a lot better than my previous attempts without the filters. By using a 2x barlow the effective focal length in these exposures was 2000mm.
(my previous attempt without using filters, 3rd january 2008)
(my 1st attempt on saturn 31th december 2007)
Most nights are cloudy, so there's not much to be seen with the telescope, so it's scope pimping time.
Here we are flying in an Alenia ATR72 turboprop from Poznan to Warsaw......
And from Warsaw with an Embraer jet airplane to Amsterdam. Here we are flying towards the west, where the sun is setting on the horizon.
This is the inside of one of the kilns. You see the ceramic heating elements that heat up the kiln. Each element can heat with a maximum current of 90A and 8kW. This enables us to heat the kiln up to about 1300 degr. Centigrade......
And this is the control room. On the right is the computer that controls the kiln I put over here last year. On the left are the 2 new ones....
Yesterday we had dinner in the "Orange Piano" where they serve the famous Polish "Zurek" soup in a very nice piece of bread......
And this morning when I opened the curtains of my hotelroom I saw a very nice sunrise.......
It is all going quite well over here in Pila. Today we burned both kilns out and tomorrow we are going to test with a dummy load of products.
One of the kilns had a broken UPS. After checking it thoroughly I found that one solder spot of the main relay was damaged.
So: I'm back in Pila again for starting 2 new kilns.