Tuesday, April 29, 2008
Almost ready with the kiln
Here is the installation, after 1 week of many hours of work it starts to work properly.
Here is the gaspanel that makes the right nitrogen oxygen mix for the process.
We are fighting for kilnpressure, and are finding many leaks and closing them. At the end we must reach about 10mBar, it is 7 now, so there are still many holes inside the system.
Subscribe to:
Post Comments (Atom)
1 comment:
Hoi Patrick, leuk om zo even wat foto's te zien. Dan weten wij ook een beetje waar je mee bezig bent en wat je daar allemaal doet. Wanneer kom je weer terug? Nou heel veel groetjes maar weer en tot hoors.
Pieter, Dianne, Rens en Amber.
Post a Comment